Andrew Lloyd Webber's latest creation located in Wembley.
Engineering advice was required for both the set, raised seating and access via bespoke staircases. A proprietary platform was installed prior to our involvement and so not only the design of the bespoke set was required but also load assessments of the previously installed structure and existing ground floor slab.
Where required, a strengthening strategy was put forward such that the performers could maintain their choreography at high speed on roller skates.
Hot rolled steel, aluminium and timber elements were designed for the installation.