A luxury residential development near Oval.
Given made ground on the site and basements on the adjoining properties traditional trench foundations would have been cost prohibitive. Therefore, a piled, reinforced concrete table top was developed to support a load bearing masonry superstructure.
The spans between load bearing lines lent itself to the use of pre-cast concrete planks, additionally, where transfer structure was required the steelwork could be set between planks, omitting downstands and achieving clean ceiling lines.