Site opening up works were only possible once the bid had been agreed and school closed for the holidays. This identified that the previously designed steel framework was not viable.
Walder Sharp quickly re-engineered a timber Vierendeel truss solution to form the new library building. The Vierendeel structure framing the openings for the new high level glazing creates a light, inspiring space for the students.